The Marseilles project included a new monocalcium and dicalcium phosphate bagging building with an enclosed stair tower for safe stair access to all facility maintenance points. Further, Buresh designed and built a new barge loading system for the monocal and dical products which filled barges through a telescoping stacker conveyor. This project was unique because of the schedule demands, the irregular shape of the warehouse building, and the challenge of tying all new structures into the existing ones.