The Fergus Falls project included a 300' x 450' flat storage building with a capacity of 3,800,000 bushels. The addition of two new truck receiving pits rated at a capacity of 20,000 BPH were utilized to fill the building. The flat building storage included a flush floor aeration system and a center reclaim tunnel with a 40,000 BPH belt conveyor. The Straight-Line building fill open belt tripper with a capacity of 40,000 BPH was fed by an existing bucket elevator system and a new 40,000 BPH transfer belt conveyor.